Dumre Besisahar Chame Road Project: Infrastructure Development in Lamjung, Nepal


 

Dumre Besisahar Chame Road Project: Infrastructure Development in Lamjung, Nepal


This extensive infrastructure project, situated in Besisahar, Lamjung, represents a significant step forward in Nepal's commitment to developing its transportation network and enhancing regional connectivity. The project, overseen by the Government of Nepal's Ministry of Physical Infrastructure and Transport, specifically through the Department of Roads (DoR) and Federal Road Supervision and Monitoring Office Pokhara, demonstrates the nation's dedication to improving its road infrastructure through systematic and well-planned development initiatives.

Project Overview and Administrative Framework 

The project, identified by the invitation number 05-DBCRP/081/82, was publicly announced on January 31, 2025, marking a crucial milestone in the region's development timeline. This initiative falls under the National Competitive Bidding procedures, ensuring transparency and fairness in the procurement process. The involvement of the Federal Road Supervision and Monitoring Office Pokhara indicates the high-level oversight and importance attributed to this infrastructure development project.

Project Components and Scope 

The project encompasses two major components, each addressing specific infrastructure needs in the Lamjung region:

  1. Emergency Roadway Protection Works:
  • Contract Number: DBCRP/33701121/081/82-04
  • Location: Andheri Khola and surrounding areas
  • Estimated Budget: NRs. 1,86,16,133.77 (including VAT and PS)
  • Bid Security Requirement: NRs. 4,15,000
  • Implementation Timeline: 90 days
  • Security Validity Period: 120 days
  • Bid Document Cost: NRs. 3,000
  1. Pavement and Drainage Enhancement:
  • Contract Number: DBCRP/33701121/081/82-05
  • Coverage Area: Multiple locations including Gairi, Chipleti, Dalal, Udipur, Bamadi, and nearby regions
  • Estimated Budget: NRs. 97,80,254.95 (including VAT and PS)
  • Bid Security Requirement: NRs. 2,15,000
  • Implementation Timeline: 90 days
  • Security Validity Period: 120 days
  • Bid Document Cost: NRs. 3,000

Strategic Importance and Regional Impact 

The project's strategic importance cannot be overstated, as it addresses two critical aspects of infrastructure development. The emergency roadway protection component focuses on ensuring the safety and stability of the road network, particularly in vulnerable areas prone to natural hazards. This proactive approach to infrastructure protection demonstrates a forward-thinking strategy in road maintenance and disaster preparedness.

The second component, focusing on pavement maintenance and drainage works, represents a comprehensive approach to infrastructure sustainability. By addressing multiple locations across the Dumre Besisahar Road, the project ensures widespread improvement in road conditions and water management systems, essential for the longevity of the infrastructure.

Bidding Process and Accessibility 

The project implementation follows a systematic electronic bidding process, reflecting Nepal's adoption of modern procurement practices. Interested parties can access detailed bidding documents through the government's e-procurement website (www.bolpatra.gov.np/egp), ensuring transparency and equal access to information. This digital approach streamlines the bidding process and aligns with international best practices in public procurement.

Financial Framework and Security Measures 

The project's financial structure includes carefully considered security measures to ensure commitment and quality delivery:

  • Combined project value exceeds NRs. 2.8 million
  • Proportional bid security requirements based on project components
  • Standardized validity periods for both bid and security documents
  • Reasonable document costs promoting wide participation while ensuring serious intent

Technical Support and Communication Channels 

The project management has established multiple communication channels for stakeholder engagement:

  • Dedicated project email: dbc.roadproject2081@gmail.com
  • Multiple contact numbers for accessibility
  • Physical office location in Besisahar, Lamjung
  • Office hours consultation availability

Project Implementation Timeline and Quality Assurance 

Both components of the project share a 90-day implementation period, suggesting careful planning and coordination of activities. The 120-day security validity period extends beyond the implementation timeline, providing additional assurance for quality completion and proper closure of project activities.

Regional Development Impact 

The project's comprehensive scope, covering multiple locations and addressing both emergency protection and regular maintenance needs, indicates its significant role in regional development. The enhanced infrastructure will likely contribute to:

  • Improved transportation efficiency
  • Better connectivity between communities
  • Enhanced economic opportunities
  • Increased safety for road users
  • Better flood and drainage management
  • Long-term sustainability of road infrastructure

Conclusion 

The Dumre Besisahar Chame Road Project represents a well-structured approach to infrastructure development in Nepal's Lamjung region. Through its dual focus on emergency protection and regular maintenance, combined with modern procurement practices and strong oversight mechanisms, the project sets a standard for infrastructure development initiatives. The careful attention to financial security, implementation timelines, and stakeholder communication demonstrates a professional approach to public infrastructure management, promising significant positive impacts for the region's development and connectivity.